ULLAS Charitable Trust
S. NoBudget ComponentSub-Component / DescriptionQuantity / BasisUnit CostDuration / CalculationTotal Cost
ACAPITAL & LABORATORY INFRASTRUCTURE₹4.253 Cr
1Water quality & sample processingMultiparameter water-quality meter; UV-Vis spectrophotometer; Colorimeter1 setOne-time₹7.50 L
2Heavy-metal analysisICP-MS; microwave digestion system; fume hood; gas & sample introduction accessories1 setOne-time₹326.00 L
3Environmental microbiologyClass II A2 biosafety cabinet; autoclave; BOD incubator; microbiological incubators; refrigerated centrifuge; microscope; colony counter; shaker; membrane filtration system1 setOne-time₹39.80 L
4Molecular biology96-well real-time PCR; conventional PCR; NanoDrop; Qubit; gel electrophoresis; gel documentation; PCR workstation; microcentrifuge; UPS & accessories1 setOne-time₹49.30 L
5Cold chain & preservation−20°C laboratory freezer; laboratory freezers1 setOne-time₹2.70 L
Capital Subtotal₹425.30 L / ₹4.253 Cr
BWATER QUALITY SURVEILLANCE — URBAN HARIDWAR₹2.160 Cr
6Urban Haridwar surveillance24 localities × 25 samples/locality600 samples/round₹1,000/sample36 months / 36 rounds*
7Testing costPhysicochemical, microbiological & relevant water-quality testingIncluded above₹600/sampleIncluded in recurring cost
8Administration & operationsSample collection, transportation, handling, logistics & operational supportIncluded above₹400/sampleIncluded in recurring cost
CWATER QUALITY SURVEILLANCE — SEMI-URBAN HARIDWAR₹4.86 Cr
9Semi-urban surveillance54 localities × 25 samples/locality1,350 samples/round₹1,000/sample36 months / 27 rounds*
10Testing costPhysicochemical, microbiological & relevant water-quality testingIncluded above₹600/sampleIncluded in recurring cost
11Administration & operationsSample collection, transportation, handling, logistics & operational supportIncluded above₹400/sampleIncluded in recurring cost
DNEXT GENERATION SEQUENCING₹8.00 L
12Next Generation SequencingSequencing of selected water/environmental samples100 samples₹8,000/sampleProgramme allocation
FCONTINGENCY & UNFORESEEN COSTS
15ContingencyUnforeseen operational, logistical, maintenance & programme-related expenses1%1% of programme subtotal₹0.11353 Cr
GTOTAL PROGRAMME REQUIREMENT36-month programme₹11.46653 Cr

Non recurring cost: ₹4.253 Cr Recurring cost: ₹2.160 Cr + ₹4.86 Cr + ₹8.00 L = ₹7.100 Cr Haridwar (Urban): ₹2.160 Cr Haridwar (Semi-Urban): ₹4.86 Cr Contingency (1%): ₹0.11353 Cr Total: ₹11.46653 Cr